Search Results
- fsr - june final
- of customers' exercising fixed price options declines. (12) BHP Billiton Rig Type/Name Water Depth Service 1976/1997 Location USGOM Brazil Petrobras Australia India ONGC N/A Thailand BP 1974/1999 ship ... of service time represents those days where a rig is scheduled to be out of service and not be available to earn an operating dayrate. Please refer to the "Out of Service Days (Shipyards, Mobilizations ... GSF Rig 140 Falcon 100 Revisions Noted in Bold Q4 Q1 Q2 Q3 Prev (6) High Specification Floater: Deepwater Kenya For the period of time that this rig is contracted to Applied Drilling Technology
- jan 2014 fsr_final
- ) Estimated Average Contract Dayrate (5) An "Idle" rig is between contracts, readily available for operations, and operating costs are typically at or near normal levels. A "Stacked" rig, on the other hand ... of stacking. GSF Magellan Sedco 700 Gabon 1976/1994/ 2008 Deepwater 1985/2007 Husky BHP Billiton Discoverer Seven Seas Rig Type/Name Water Sedneth 701 Depth Service 1987/1997 1983/1988 1983/1992 1976/1997 ... Jackups Transocean Rather GSF Rig 135 Total Estimated Days Out of Service Stacked Rigs Prior to 2010 Start Date Estimated Contract Drilling Revenue can be calculated as: Paid Days on Contract * Average
- pursuit-2017-09
- stock-closing prices. This includes the assumption of about $2.2 billion of debt and the acquisition of Songa’s equity valued at approximately $1.2 billion. • NEW CUSTOMER-DRIVEN RIG DESIGN• PURPOSE-BUILT RIG OPTIMIZED FOR MID-WATER PRODUCTION DRILLING• PROVEN TECHNOLOGY DESIGNED IN COLLABORATION WITH THE INDUSTRY• TARGET TO BE 20% MORE EFFICIENT• STRONG FOCUS ON HSE• EXCELLENT MOTION CHARACTERISTICS ... no doubt that this transaction makes us stronger today and going forward.”Transocean expects to complete the purchase of Songa during the fourth quarter of 2017.WHAT IS A CAT-D RIG? STATOIL SAYS
- april 2019 fleet status report final
- april 2019 fleet status report final FLEET STATUS REPORTAPRIL 2019 Transocean Ltd. (NYSE: RIG)Updated: April 17, 2019Revisions Noted in BoldDynamically positioned Dayrate onDayrate onYr. (1)WaterDrilling EstimatedEstimatedCurrentPreviousFootnote FloaterDynamicallyEnteredDepthDepthContractExpirationContract (3)Contract (3)Rig Type/NameReferencesTypePositionedService(Feet)(Feet ... TBA12,00040,000USGOMChevronQ4 2021Q4 2026455,000 N/AOcean Rig Crete(16)shipTBA12,00040,000TBAOcean Rig Santorini(16)shipTBA12,00040,000TBATransocean Norge(7), (8), (12)semi
- october 2014 fleet status report (pdf)
- , 2014—Transocean Ltd. (NYSE: RIG) (SIX: RIGN) today issued a comprehensive Fleet Status Report which provides the current status and contract information for the company’s entire fleet of offshore ... contract in an undisclosed location at a dayrate of $335,000 for the first three years and at an indexed rate for the fourth year ($478 million estimated backlog). The rig’s prior dayrate was $400,000. Transocean Amirante – Awarded a one year contract in an undisclosed location at a dayrate of $335,000 ($122 million estimated backlog). The rig was previously idle. Estimated 2014 planned
- january 2015 fleet status report (pdf)
- , SWITZERLAND—January 15, 2015—Transocean Ltd. (NYSE: RIG) (SIX: RIGN) today issued a comprehensive Fleet Status Report which provides the current status and contract information for the company’s entire fleet ... – Awarded a one well contract in the Norwegian sector of the North Sea at a dayrate of $340,000 ($14 million estimated backlog). The rig’s prior dayrate was $368,000. M.G. Hulme, Jr. – Awarded a one well contract offshore Malaysia at a dayrate of $174,000 ($10 million estimated backlog). The rig’s previously announced contract dayrate was $200,000. The Discoverer Spirit, Deepwater Frontier
- april 2014 fsr final 1
- price options declines. (19) (14) (12) Estimated Average Contract Dayrate (5) An "Idle" rig is between contracts, readily available for operations, and operating costs are typically at or near normal levels. A "Stacked" rig, on the other hand, is manned by a reduced crew or unmanned and typically has reduced operating costs and is (i) preparing for an extended period of inactivity, (ii) expected ... for 30 to 60 days following initiation of stacking. Sedco 700 Gabon 1976/1994/ 2008 Deepwater 1985/2007 Husky BHP Billiton Discoverer Seven Seas Rig Type/Name Water Depth Service 1987/1997 1983/1988
- fsr-july-final with pr
- 713-232-7551 Diane Vento +1 713-232-8015 Media Contact: Guy A. Cantwell FOR RELEASE: July 17, 2013 +1 713-232-7647 TRANSOCEAN LTD. PROVIDES FLEET STATUS REPORT ZUG, SWITZERLAND—Transocean Ltd. (NYSE: RIG ... on the Sedco 704. Forecasted out-of-service time for 2014 is also provided on a rig by rig basis. Relative to preliminary guidance provided in February, out-of-service time for 2014 decreased by a net 381 ... www.deepwater.com. TLtd (NYSE RIG) (SIX RIGN)Transocean Ltd. (NYSE: RIG), (SIX: RIGN)Updated: July 17, 2013Yr. (1)WaterDrilling EstimatedEstimatedDayrate onDayrate onFootnote
- frontiers_spring_2000
- updates on our advanced drilling rigs.Rig LocatorWorld map and complete rig listing.On the Cover: TheSedco Expressnear Brest, France,is leading the way in redefining semisubmersible rigs.CONTENTSSpring ... • Faster penetration rates •At first glance from the arriving crew boat,the well-lit rig miles away on the frothybay could be any semisubmersible arrivingor departing from the DCN shipyard near Brest,France.But from just a mile out and minutesbefore dawn in February,the gleaming SedcoExpresslights make one thing clear:This is noordinary-looking offshore drilling unit.And thework that the rig
- pr_fsr_april_final
- Diane Vento +1 713-232-8015 Media Contact: Guy A. Cantwell FOR RELEASE: April 18, 2013 +1 713-232-7647 TRANSOCEAN LTD. PROVIDES FLEET STATUS REPORT ZUG, SWITZERLAND—Transocean Ltd. (NYSE: RIG) (SIX ... – Awarded a one-year contract for work offshore Morocco and Senegal. The dayrate for Morocco is $600,000 ($219 million estimated contract backlog). The rig’s prior dayrate was $520,000. Transocean ... at a dayrate of $168,000 ($61 million contract backlog). The rig’s prior dayrate was $160,000. On March 26, 2013, the newbuild high-specification jackup, Transocean Siam Driller, commenced its